The Misconception Series #6: Drawings & Specs ARE Complementary

10/22/2018

8 Comments

 
Picture
Contributed by Liz O'Sullivan
Recently, I was preparing a masonry architectural specification section for a remodel project.  The project has an existing CMU wall which is to receive a small area of new CMU infill.  It’s an exterior structural wall, and the architectural drawings indicate that the infill CMU is to be grouted solid.
 
I asked the structural engineer if we need reinforcing bars (rebar) in the cores of the CMU. I told him that I would delete rebar from the spec section if we don’t need rebar, so that the Contractor knows he doesn’t need to provide it.
 
The engineer said, “You can just leave it in the specs.  If the rebar isn’t on the Drawings, they’ll know they don’t need it.”
 
NNNOOOOOOOOOOOOOOOOOOOOO…..!!!!!
Drawings and Specifications are complementary and what is called for by one shall be as binding as if called for by both.” ​
This is according to the General Conditions of the Contract for this project.  This is a typical provision in construction contracts. (1)
 
So, if rebar isn’t required for that wall, there should be no rebar in the spec or on the drawings.  If rebar is in the specs, even if it’s not on the drawings, rebar is required by the contract.  If rebar is on the drawings, even if it’s not in the specs, rebar is required by the contract.
 
Design professionals need to completely comprehend this concept, and for some unknown reason, many don’t.  Contractors need to completely comprehend this requirement, and for an understandable reason (it’s not in their best interest at times) they don’t always seem to grasp this.
 
The lead design professional on the project, the entity who is performing construction contract administration, is the party who must enforce the contract documents, including the specifications.  This party has to understand the relationships among contract documents before he or she can properly enforce them.  If the specifications and drawings have been prepared to be complementary, and are clear, concise, correct, and complete, they will be easy to understand (for all parties) and easy to enforce.

Read More
8 Comments

Laying the Groundwork:  Breakfast & Specifications

9/25/2018

3 Comments

 
Picture
Contributed by David Bishton
Breakfast? With a specifier? You may wonder about the wisdom of such an engagement, but it is a unique experience. It occurred to me today that there are some uncanny similarities between project specification preparation and the simple (or complex) task of preparing breakfast. In this case, breakfast for a crowd.

The first thing to know is that the Specifier comes to YOUR house, either in person or virtually or both, to help YOU plan and make the breakfast. So wait, I can hear you say, the SPECIFIER DOES NOT DO ALL THE WORK? In case you hadn’t noticed I use capital letters for emphasis – I learned it from this really smart 5th grade (I assume) kid I found on Twitter. Anyway, the answer is no, but the Specifier can be your most able assistant.

So how does it work? The first thing I as a Specifier want to know is more about what’s on the menu – what did you have in mind to serve this big crowd that you’ve invited over? Oh, it’s a pot luck! You have the main course and everyone is bringing something to the table. So how can I help – what’s in the fridge?

I open the refrigerator door and what to my wondering eyes should appear? A miniature sleigh – wait, that’s from another story – a really large tray of the most beautiful eggs I’ve ever seen. And every nook and cranny stuffed with marked and unmarked containers of every size and shape. You are REALLY PROUD of those eggs! So how can I help? I can chop onions, garlic, veggies, make sausage, prepare a fruit salad, get all the herbs lined up, make toast, help set the table – I’ll even go to the store if you need something. Just tell me what you need. “First, look through this 150 page recipe and find the ingredients. Then figure out what’s in all these containers. I might be missing some things.”

Read More
3 Comments

(Glaziers’) Roadmap to Successful Substitution Requests

4/16/2018

3 Comments

 
Picture
Contributed by ​Joe Schiavone
(Editor's note: While addressed to glaziers, this article is ideal for any building product representative or manufacturer)

Substitution Requests are prevalent in construction projects of all scales. They offer several benefits to glazing contractors, such as helping them win a job; however, there is a right way and a wrong way to submit them.
 
A firm understanding of the procedures involved in Substitution Requests can increase the likelihood of the product being accepted, and of repeat business as a result of building a favorable reputation. With architects facing increasingly tight schedules, the submitter should be aware that the odds of success often depend on how clear and concise the Substitution Request is.
 
The Basics
Substitution Requests are simply proposed changes in products, equipment, and/or methods of construction from those that are specified by the architect. Nearly every project—regardless of project delivery method—encounters product substitutions so opportunities are abundant.
 
The most opportune time in the project lifecycle to submit a Substitution Request is during the bid phase when the general contractor is seeking out a glazing contractor. This creates a level playing field amongst bidders. It's possible to submit a Substitution Request during construction, but the process can be more complicated and should only be pursued when certain issues arise such as material unavailability, excessive lead times, or a change in code requirements.
 
There are several scenarios where substitutions are practical and feasible. CSI's Construction Contract Administration Practice Guide identifies key areas in which a Substitution Request should be reviewed. They include:

  • Shorter Construction Schedule
  • Lower Overall Cost, Including Operation and Maintenance
  • Improved Quality and Performance
  • Superior Sustainable Features
  • Enhanced Aesthetics
  • Better Warranty and Manufacturer Reputation
 
The substitution should add value and present clear advantages to the architect, and ultimately the owner, if it's to be approved. It must also be equal or superior to the specified product, and cannot adversely impact the project cost or schedule.
 
When submitting a Substitution Request, glazing contractors and product manufacturers should work directly with the bidding general contractor. Not doing so can be detrimental to the team dynamic and slow the project's progress. Although contacting the architect is possible, you risk immediate rejection. You also risk building a detrimental reputation for not following established protocol, which can cost you future work.
 
In some cases, a designer without formal Contract Document training writes the specifications. They may also be written in haste because of rushed schedules. This means that an experienced glazing contractor has more opportunities to spot potential conflicts that are overlooked, and suggest substitutions that will improve quality or reduce risk. 

Read More
3 Comments

Construction Documents: What Don't You Know (Pt. 2)

4/10/2018

2 Comments

 
Picture
Contributed by Cherise Lakeside
(Editor's Note: Please make sure you've read Part 1 of this article here)

5. The Actual Specification Section for your Work: At our workshops and presentations, the general feedback from Subcontractors has been that they only look at the sections specific to their work, if they look at the specifications at all.  This is a mistake and you are exposing yourself to added risk if that is how you operate. 
  • If you are a flooring subcontractor, besides looking at the requirements for your work, you should understand and review the specifications for the subfloor that goes under your product.  We all know that the concrete is poured or the sub-floor is installed typically well before the flooring installer arrives on the job.  Also, a flooring installer is often coming in at the 11th hour as the GC doesn’t want to be performing construction on new floors.  This is the absolute worst time to discover you have a problem.
  • If you understand what your product requires for the subfloor, review those specs during the bid period and point out any problems that you may find (i.e. inadequate concrete curing time) prior to the bid – you have a good chance of having it corrected in an Addendum and not having to deal with (and/or pay for) the issue later.  Even if it doesn’t cost you actual dollars to deal with an issue, if it costs you time, it’s the same thing.
  • Your Spec Section(s) are specific to your work and has three parts.  This is for a reason and designed as such to help you find what you need quickly and easily.

Part 1 GENERAL of the Section is the third layer of Administrative Requirements on the project.  These requirements are specific to your product.  Part 1 will include things like submittals, warranty, pre-installation meetings, codes, closeout procedures, samples, mock-ups, testing, etc. SPECIFIC TO YOUR PRODUCT/INSTALLATION.  These requirements are IN ADDITION TO the General Conditions (Broad Project Requirements) and the Division 01 Requirements (Specific Project Wide Requirements).  Basically, you have three places to look to understand what you are required to do and provide.

Part 2 PRODUCTS is everything you need to know about the products you are to provide for your work.  Manufacturer, type, style, size, color, transitions, accessories, etc.  You will also find things like factory testing requirements.

Part 3 EXECUTION includes all of the information and requirements for the installation of your product.  This can include things like pre-installation testing, limits on substitutions, performance criteria, operation and controls, shop fabrication, assembly, finishing methods, installation instructions, preparation, site quality control, cleaning, closeout activities, training and maintenance.

The bottom line is that there is very important information in the full drawings and specifications of which you need to be aware.  Having full knowledge of these items will help you spot conflicts between the drawings and specifications, understand what work is expected of you and help you reduce risk from the very beginning.  If you are awarded the project, this early knowledge of the requirements will help you ask the right questions, plan your work efficiently, proactively address issues and save you time.

This article represents only a portion of the knowledge you should have if you work in any discipline in Architecture, Engineering or Construction.  The good news is, there are places you can get this knowledge with programs that are well rounded and affordable. 

The Construction Specifications Institute offers cradle-to-grave education in Project Delivery through the CDT (Construction Documents Technologist) Education Program.  You can find out more here: https://www.csiresources.org/certification/cdt

The FCICA (The Flooring Contractors Association) offers the CIM (Certified Installation Manager) Program which also offers education in Construction Documents.  Information on that program is located here: https://www.fcica.com/CIM

We hope you join us at the table for better coordination and collaboration with less risk!

(This article was previously published in the Flooring Contractor Magazine, Volume 13 No. 3, which you can read here. )
Picture
2 Comments

Construction Documents: What Don’t You Know? (Part 1)

4/2/2018

2 Comments

 
Picture
Contributed by Cherise Lakeside
It is an enlightening experience when you get out from behind your desk and start talking to other people in the industry.  It doesn’t take much time to figure out that every discipline approaches a project and the documents from a unique and different perspective. 

What is a real travesty in Architecture, Engineering and Construction (AEC) is that many of us are not getting adequate Contract Document education in our colleges, universities, trade programs or on the job.  This leads to added risk, cost overruns, conflicts, disputes, time delays and sometimes even litigation.  The worst part is that it is an easy thing to fix.  If we were really moving forward, Contract Document education would be required for everyone working in the built environment.

Right now, our education mainly comes from a trial by fire.  You screw up on the job and then you learn what you should not do again.  Unfortunately, we continue to hand down bad habits, misconceptions and incorrect information from senior to junior staff.  As a result, we continue to make the same mistakes.  We would like to try to start fixing that.

This article is meant to give you just a taste of some of the things you should be thinking about and looking at before you submit your bid and, if awarded the contract, before you start the work.  Trust us when we say there is plenty more to learn but hopefully this will give you a head start.

  1. Understand that the Drawings and Specifications are written for the General Contractor and it is the GC’s responsibility to administer the means and methods on the job site, with all of the other parties involved, to complete the work.  That said, understanding the Contract Documents will help you prepare a better bid, reduce risk during the work, better communicate and protect your interests with the GC if there is a problem.
  2. Do you have a full copy of the Contract Documents?  Drawings and Specifications?
    You are misguided and at risk if you think you have all of the information you need on just a couple of sheets of drawings that show your work.  There is a reason they are called ‘Contract Documents’.  It is because the Contract between the Owner/Architect and the Contract between the Owner/Contractor names the Drawings and Specs as part of the Contract.  Would you sign any other contract without reading all of the requirements?
    Also, if the documents are prepared correctly, the drawings should show locations and spatial requirements and your specifications will outline the products to be used, installation requirements and other special administrative requirements that pertain to your work.  There is no way you can properly prepare a bid without reviewing all of the documents that pertain to the work you are required to provide.
    The Contract Documents also require that the General Contractor review all of the documents related to the work.  Most Subcontractors and Installers would not know this because they don’t see the Owner/Contractor agreement.  If you get the job, you will be asked to sign an agreement with the General Contractor that includes ‘flow down language’ requiring you to comply with those same requirements.  This typically means one sentence that says you have to comply with the same contract requirements that the General Contractor has agreed to with the Owner.  The only way to adequately understand these requirements is to get a full copy of the documents and read them.
  3. Division 00 – Procurement Requirements Division 00 is typically the first section in the Specifications.  Sometimes it is distributed as a separate volume.  These are all the rules of bidding and will include the General and Supplemental Conditions (broad administrative requirements for the project).   Division 00 will outline how your bid must be prepared, what documents must be reviewed, how bids will be awarded, when the bids are due, required (or not) pre-bid meetings and a host of other information.  If you are a Subcontractor, a one or two page bid sheet from the GC with a couple sheets of your drawings and your spec section is not enough.  You need to, at the very least, review all of the Division 00 requirements to understand if there are other things that affect you and your work.
  4. Division 01 – Administrative Requirements
    Division 01 represents the rules of the road for your specific project (the 2nd level of Administrative Requirements for the Project that is more narrowly defined than the General Conditions).  The list is lengthy in Division 01 and every item could potentially affect you, your bid and your work.
     
    Division 01 applies to the entire project and you will find items like: (this is only a partial list)
  • A description of the project.
  • Owner work or Owner furnished items.
  • Price and payment procedures for the project.
  • Codes and reference standards.
  • Required pre-installation meetings and scheduling.
  • Submittal and mock-up requirements.
  • Alternates, Allowances and Unit Prices potentially effecting your bid
  • Sustainable design requirements for the project.
  • General product requirements.
  • Project closeout requirements.
  • Maintenance material requirements.
  • Substitution Requirements (before and after the bid).
  • Rules of communication.
  • Quality assurance and testing requirements.
  • Requirements for how your materials are delivered, handled and stored.
  • Project warranty requirements.
  • Temporary facility requirements.

Every single bulleted item above has the potential to affect the time you have to spend on the work of the project, which then affects the bid you need to prepare.  Nobody wants to find out after they have signed a contract that the project has extensive submittal requirements that may take a lot of hours,  or an expensive mock-up or something else that you did not include in the bid because you didn’t see it.  Remember, you are required to review ALL of the Contract Documents.

Click here to read Part 2 of 'Construction Documents: What Don't you Know?'

(This article was previously published in the Flooring Contractor Magazine, Volume 13 No. 3, which you can read here. )
Picture
2 Comments
<<Previous
Forward>>

    About

    Let's Fix Construction is an avenue to offer creative solutions, separate myths from facts and erase misconceptions about the architecture, engineering and construction (AEC) industry.


    Check out Cherise's latest podcast
    Picture


    Get blog post notifications here

    Enter your email address:

    Delivered by FeedBurner

    RSS Feed


    Archives

    March 2022
    May 2021
    May 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016

    Categories

    All
    Architecture
    Certification
    Collaboration
    Communication
    Concrete
    Construction
    Construction Administration
    Contract Documents
    CSI
    Education
    Estimators
    Fabrication
    Fix
    Manufacturing
    Misconception
    Myths & Facts
    Podcast
    Refresh
    Specifications
    Subcontractors
    Technology
    Training

    Tweets by FixConstruction
Powered by Create your own unique website with customizable templates.
  • Blog
  • Why & Who?
  • Workshops
    • Upcoming Workshops
    • A & E Coordination
    • CDT Education Program
    • Let's Fix Construction
    • Social Media & AEC
    • Specifier/Product Rep
    • Specs 101
    • Young Professionals
    • Past Workshops
  • Contributors
  • Submit
  • Accolades
  • Donate
  • Contact